Siemens S7-1200 G1 Phase-Out Starts in November 2026: Key Dates For Users

Aug 22, 2026

Leave a message

Lifecycle Update · 2026

S7-1200 G1 Phase-Out: The Dates Automation Teams Should Plan Around

Siemens plans to begin the gradual phase-out of the first-generation SIMATIC S7-1200 portfolio on November 1, 2026. New-device ordering is planned to remain available through October 31, 2027, while module spare-parts availability is planned to continue for years afterward.

What the announcement means

This is a lifecycle transition, not an instruction to remove working controllers overnight. Existing machines can continue to operate, but designers, maintenance teams and purchasing departments should start separating three needs: controllers for new projects, replacement stock for the installed base, and a migration plan for future machine revisions.

Siemens S7-1200 lifecycle and migration planning

Lifecycle planning starts with the exact installed S7-1200 configuration.

Official planning timeline

Three dates to put on the project calendar

NOVEMBER 1, 2026

Gradual phase-out begins

Start formal lifecycle reviews for active bills of material, service stock and planned machine builds.

OCTOBER 31, 2027

Planned end of new-device ordering

Confirm remaining G1 demand early; lead time and availability can vary by exact MLFB and region.

APPROXIMATELY 2036

Planned module spare-parts horizon

Siemens states planned spare-parts availability for modules until approximately 2036.

Recommended action

Audit the installed base before buying

Record the complete MLFB, hardware version, firmware, I/O expansion, signal boards, communication modules, safety requirements and TIA Portal project version for every critical machine.

Do not assume a drop-in swap.

A migration can affect device selection, cabinet space, terminal assignments, wiring, firmware, engineering software and program behavior. Validate the exact configuration before ordering or commissioning.

Siemens S7-1200 MLFB and nameplate verification

Use the complete MLFB and nameplate details when auditing spares or planning migration.

A practical four-step response

01 · Classify machines

Separate active production assets, service-only systems and new designs.

02 · Quantify exposure

Count critical CPUs and modules, then compare that count with existing spares.

03 · Select a path

Decide which systems remain on G1 and which projects should move to S7-1200 G2.

04 · Test the migration

Build, download and commission a representative machine before changing a fleet.

Useful S7-1200 G1 references

Examples from the current S7-1200 CPU range can help teams identify the complete ordering code before checking stock or planning a replacement.

Need to check an exact S7-1200 ordering code?

Send the complete MLFB, quantity, firmware or hardware details, destination country and required delivery date. Availability and compatibility should be confirmed for the exact configuration.

Email Cristina WhatsApp +86 180 2071 4662
Sources: Siemens official S7-1200 migration information and migration guideline. Lifecycle dates are planning information and should be rechecked with Siemens for the exact region and product before a purchase or engineering decision.
Send Inquiry